Residential & Collector Streets Rehabilitation (Area 1) and Arterial Street Improvements

Project InformationMap of Area 1 Slurry Seal Project

Construction Period: June 27, 2022 – August 31, 2022

Information: Contact the Public Works Department – Engineering at (909) 839-7040 or publicworks@diamondbarca.gov 

Cost: $2.5 million

Funding Source: Measure M, Measure R, Gast Tax, Hauler Fee, SB1 and Prop C

Project Construction Map Schedule
The following maps list a tentative schedule and may change depending on daily field conditions.

Project Description

Residential and collector streets (Area 1)

  • Slurry seal
  • Chip seal
  • Localized asphalt concrete
  • Curb ramp reconstruction

Street rehabilitation on Golden Springs Drive from Brea Canyon Road to Lemon Avenue - See map for project area

  • Pavement grind and overlay between 2” – 4”
  • Enhanced bicycle lane striping
  • Roadway signing and striping