Project Information
Construction Period: June 27, 2022 – August 31, 2022
Information: Contact the Public Works Department – Engineering at (909) 839-7040 or publicworks@diamondbarca.gov
Cost: $2.5 million
Funding Source: Measure M, Measure R, Gast Tax, Hauler Fee, SB1 and Prop C
Project Construction Map Schedule
The following maps list a tentative schedule and may change depending on daily field conditions.
Project Description
Residential and collector streets (Area 1)
- Slurry seal
- Chip seal
- Localized asphalt concrete
- Curb ramp reconstruction
Street rehabilitation on Golden Springs Drive from Brea Canyon Road to Lemon Avenue - See map for project area
- Pavement grind and overlay between 2” – 4”
- Enhanced bicycle lane striping
- Roadway signing and striping
- Curb ramp reconstruction